Picture Gallery: Reconstruction of Back Entry

`
plan
floor plan
work area before
work area
before
work area interm.
work area
intermediate
work area after
work area
after
section
section A-A
stairs before
garage stairs
before
stairs intermediate
garage stairs
intermediate
demolition
demolition of
stone pillar
debris
state of
maximum mess
snake
a visitor
new door
new door installed
Nov. 2005
flue
reroute flue
Oct. 2007
peelingRoof
peeling away
garage roof
lowering joist
removing joists
space clear
old roof is gone
metal deck
cutting metal
decking
platform
milestone
August 16, 2008
framing closet
framing closet
stair framing
framing stairs
to 2nd floor
door removed
side show: replace
glass doors
door replaced
side show: mission
accomplished
other stair
building
the other stair
close hole
closing hole
in floor
milestone 2
milestone 2
March 18, 2009
milestone 3
milestone 3
June 13, 2009
cutting hole
cutting hole
for 2nd staircase
milestone 4
milestone 4
July 26, 2009
Pearl at door
Pearl at door
new pantry
new pantry
new pantry
cat door
mud tile
tiling in the
mud room
2nd staircase
finishing the
2nd staircase
mural
painting
a mural
mural
mural finished
mudroom
mudroom finished
skylight
skylight
installed
back stairs
backstairs
finished

Last change made to this page: Jan. 9, 2012