Home > Projects > Construction Projects > Picture Gallery

The new staircase leading directly to the study on the 2nd floor, which was accessible only through a bedroom before, is now done. With this, the basic framing for the entire project has been completed.

We now need the electrician to come and complete the new wiring. Once the building inspector has approved it, I can begin covering the walls.

stairs done

Last change made to this page: July 27, 2009

Back to Ulrich Flemming's projects page