Menu

48_400_500_650 | SoA Design Build Studio | F19

Final Reviews:
Tuesday, 9 December 2019 (@SoA)
Friday, 13 December 2019 (@WCF)

Last Updated on 2019.11.26 by slee

Deliverables

NB: The first floor elevation we are matching in the school is 100'-0". Mark on all drawings.